PROJECT 03 / STRUCTURAL AND CIVIL WORKS

Donald D. Summerville Olympic Pool - Restoration

A major public-facility restoration at Toronto’s iconic waterfront pool, designed to renew durability, safety and everyday performance.

Donald D Summerville Olympic Pool restoration

Toronto, Ontario

LOCATION

2024

PROJECT DATE

Structural and Civil Works

SERVICE

Pool Restoration

SCOPE

THE PROJECT

Rehabilitating a Toronto waterfront landmark

Built for public use and long-term resilience

South Central Inc. completed a major restoration at Donald D. Summerville Olympic Pool, Toronto’s iconic waterfront facility. The work brought renewed durability and functionality to a highly used public recreation destination.

The scope included concrete repairs, waterproofing, tile replacement, pool deck rehabilitation and structural upgrades. Careful planning helped maintain public access to the surrounding park while work progressed across the site.

From condition repair through new finishes, the project required coordination across multiple disciplines and careful attention to public-facing details. The completed work supports a resilient, welcoming pool facility for Toronto residents and visitors.

Donald D Summerville Olympic Pool restoration
PROJECT GALLERY

Inside the pool restoration

Open any image to view it in the Elementor lightbox. Every gallery image can be replaced, reordered or expanded directly in Elementor.

Start a project with South Central Inc.

Planning a heritage restoration, structural repair or complex construction assignment in Toronto? Tell us about the project and our team will help define the next step.