South Central Inc. completed a parking garage restoration for the Windmill Line Housing Cooperative in Toronto. The project addressed key building-envelope and structural concerns while supporting the reliable use of a vital residential amenity.
The scope included concrete repairs, waterproofing, drainage improvements and protective coatings designed to extend the structure’s service life. Each repair was coordinated to provide resilient performance in a demanding parking environment.
From assessment through final protection, the work required careful sequencing and attention to the interfaces between concrete, drainage and waterproofing systems. The completed garage restoration helps preserve the facility for residents over the long term.